Construction Delivery Method: Design / Bid / Build
Demo: Demo of all interior finishes; demo of CMU exterior wall for new point of egress
Plumbing: 3 compartment sinks; hand wash stations; drinking fountain; hot water heater
Mechanical: Walk in hoods for evaporation area, new HVAC
Electrical: New electrical and lighting inc. explosion proof LEDs
Framing / Drywall: CEMCO joists / rack storage deck; fire rated demising walls
Life Safety: New fire alarm and sprinkler systems; CO2 monitoring equipment
Interior Finishes: Epoxy concrete flooring; RFP; fire rated and explosion proof doors and finishes; GMP rated finishes for lab/ extraction area
Exterior Finishes: ADA accessible sidewalk curb; CMU trash enclosure; exterior lighting and signage; expanded exterior door