Construction Delivery Method: Design / Bid / Build
Demo: Remove existing fixtures and finishes; asbestos abatement; floor resurfacing post abatement
Structural: Saw cuts and new CMU opening
Plumbing: Install new plumbing to 5 bathrooms and kitchen; new fixtures throughout
Mechanical: Install roof vent with disconnect and returns
Electrical: Upgraded electrical to GCFI throughout; new interior lighting and fixtures; exterior lighting upgraded to LED
Finishes: New cabinetry and countertops in kitchen and bathrooms; powder coated bathroom partitions; floor and wall tile, carpet, LVP, and paint